• This field is for validation purposes and should be left unchanged.
Customer Case Verhoef Access Technology Trimergo
20 November 2017
Verhoef Access Technology
Verhoef Access Technology is an established name in the international petrochemical industry. Based in Aalsmeerderbrug in…
Download More info
  • This field is for validation purposes and should be left unchanged.
Customer Case about Brink
19 July 2016
Brink Group: ERP for the manufacturing of machinery and moulds
So, you manufacture moulds and machines as well as production lines to customer specifications. All within one organisation. Since 1963, Van de Brink’s 75 employees have been manufacturing die-casting moulds…
Download More info
  • This field is for validation purposes and should be left unchanged.
Customer Case about Airbus Defence and Space
19 April 2016
Airbus Defence and Space: ERP for Defence and Space
Airbus Defence and Space makes solar panels, space instruments, rocket segments and other subsystems for space – and does so faultlessly. Delivering all products without one single defect is…
Download More info
  • This field is for validation purposes and should be left unchanged.
Customer Case about Mercon Steel Structures
10 January 2016
Mercon Steel Structures: Manufacturing Complex Steel Structures
Since its foundation in 1976, Mercon Steel Structures B.V. has been dedicated to the design and fabrication of steel constructions for customers that specialize in extraction and refinery of…
Download More info
  • This field is for validation purposes and should be left unchanged.
Customer Case about Petrogas Gas Systems
7 May 2015
Petrogas Gas Systems: Live with Trimergo ERP within three months
The rising demand for gas installation in recent years boosted the turnover and size of Petrogas. At the same time, there was a need for further professionalisation: working with…
Download More info
  • This field is for validation purposes and should be left unchanged.
Customer Case about SAS Offshore
18 October 2014
IHC SAS: Getting Shorter Project Lead Times
SAS produces complex deep water pipelay systems. Production lead times vary from 6 months to 18 months. This makes it important to monitor every aspect of such a project….
Download More info
  • This field is for validation purposes and should be left unchanged.

Trimergo develops and implements innovative
ERP software for Project-Driven Companies

Ask us anything
X
  • This field is for validation purposes and should be left unchanged.

Pin It on Pinterest